Carson City road report for Sept. 28-Oct. 4

Share this: Email | Facebook | X

The following information applies to the period of Sept. 28 – Oct. 4.

Utility work will continue Monday through Thursday with flagger controlled traffic at the following locations:

Fleischmann Way between Mountain and Division streets

Mountain Street between Fleischmann Way and Long Street

Long Street between Mountain and Division streets

Division Street between John and Long streets

Sierra Circle

Hillside Way

Miller Way

Pine View Way

Lane Circle

The Nevada Department of Transportation will continue bridge maintenance on the Carson City Freeway (I-580) with nightly lane closures and intermittent on and off ramp closures during weeknights from 8 p.m. to 6 a.m.

NDOT will continue paving operations on I-580 in Washoe Valley. There will be nightly lane closures from 9 to 11:30 p.m. for the next several weeks from the North Carson Street interchange to the Bowers Mansion interchange (Exit 50).

Beginning Tuesday, Sept. 29, through Friday, Oct. 2, Oregon Street will be closed to through traffic between Roop Street and Wright Way. Detours will be signed, and access to the DMV will be available from Wright Way, off Stewart Street.

Race Track Road will continue to be closed between Bigelow Drive and Schulz Drive due to utility work. Detours will be signed.

The intersection of Cochise Street and Overland Street, as well as Overland Street between Cochise and Voltaire streets, will be closed to through traffic from 7 a.m. to 5 p.m. weekdays. Detours will be signed.

Utility work will continue Monday through Thursday at the following locations:

Shoulder work on Washington Street between Ormsby Boulevard and Mountain Street

Bulette and Bunker Hill drives will both be closed at Washington Street during daytime hours; detours will be signed

On Thursday, Oct. 1, there will be shoulder work on Silver Oak Drive west of GS Richards Boulevard. Drivers are asked to use caution.

Due to sidewalk improvements, there will be lane closures at the following locations:

Long Street between Carson and Stewart streets

The outside northbound lane on Carson Street between Park and Long streets

Fall Street at Long Street

Peters Street at Long Street

The Nevada Department of Transportation will continue construction of drainage improvements on U.S. Highway 50 West between the two truck ramps (just west of U.S. 395 to Sierra Highlands Drive). There will be lane closures weekdays, but the roadway will remain open to traffic in both directions.

Clear Creek Avenue remains closed to through traffic between Lynette Lane and Center Drive due to utility work. Detours are signed and the JAC bus stop on Clear Creek Avenue is temporarily relocated near the intersection of Frontage Road and Clear Creek Avenue.

Work on the construction of the Carson City Freeway continues. Drivers are asked to use caution in the areas around the construction site, particularly along S. Carson Street.