REQUEST FOR PROPOSALS
_________________________________________________________
MINDEN GARDNERVILLE SANITATION DISTRICT
GRGID INTERCEPTOR PROJECT
NOTICE TO CONSTRUCTION MANAGERS AT RISK:
The Minden Gardnerville Sanitation District Board of Trustees
invites sealed proposals for the project entitled GRGID Interceptor
Project, to be received at the Resource Concepts, Inc. office, located
at 340 N. Minnesota Street, Carson City, NV 89703, until 2:00 P.M.
local time on Thursday, June 10, 2021. This request for proposals is to
solicit a Construction Manager at Risk to provide experienced and expert
services for the project.
The project is in Gardnerville, Nevada as shown on the project plans.
The scope of work involves rehabilitation of thirty-seven (37) existing 60-
inch diameter sanitary sewer manholes, lining approximately 12,160 LF
of existing sanitary sewer main. The manholes range in depths from 6.5’-
17’ deep, and the sewer mains range in diameter and material, including
cement lined cast iron pipe, and asbestos cement pipe. Manhole
Rehabilitation work includes interior concrete surface preparation and
repairs, application of a rigid polyurethane coating system, and roadway
surface finish repairs if necessary. Sewer main lining work anticipates a
“Cured-in-Place Pipe”, lining installation & curing process, and restoring
lateral connections. All work is to be conducted while maintaining the
operation of the system, with appropriate
bypass procedures. The project includes all associated traffic control and
securing all Nevada Department of Transportation (NDOT) and Douglas
County Permits & Inspections, which will include preparation of traffic
control plans. MGSD retains the right to modify the scope of the project.
Total Estimated Construction Budget: $ 3,350,000.00
CONSTRUCTION MANAGERS AT RISK SERVICES:
Pre-construction design assistance, budget verification, value
engineering analysis, scheduling, phasing, and execution logistics.
Providing bidding assistance with a Guaranteed Maximum Price in
accordance with NRS 338.1696. Construction schedule and staging
review, recommendations for temporary bypass pumping, project cost
analysis, and coordinated phasing with Owner’s budget. Construction
management and completion once a contract is executed.
APPROXIMATE SCHEDULE
Non-mandatory pre-submittal meeting will be held at 10:00 A.M. on
Tuesday, May 25, 2021, at the Minden Gardnerville Sanitation
District Office. (1790 U.S. Highway 395)
Interviews of short-listed CMAR Contractors is June 23, 2021.
Pre–Construction services is July 13, 2021 through October 30, 2021
Construction Start for Phase 1 (River Crossing) is November 15, 2021
REQUEST FOR PROPOSAL DOCUMENTS
Request for Proposals Package will be available after 10:00 A.M. on
Monday, May 17, 2021, and may be obtained electronically, upon
request by contacting RCI at kathyh@rci-nv.com. Sealed Proposals
must be received at the ENGINEERS’s office located at 340 N.
Minnesota Street, Carson City, NV 89703, by 2:00 P.M, June 10, 2021.
ENGINEER:
RESOURCE CONCEPTS, INC.
340 N. Minnesota St.
Carson City, NV 89703
Contact: Mr. Keith R Shaffer, P.E., Project Manager
Phone: (775) 883-1600
Public Works Project Identifying Number: PWP-DO-2021-303
Pub: May 15, 22, 29, June 5, 2021 Ad#13217