Douglas County
Water Conveyance Advisory Committee
Public Hearing
A special meeting of the Water Conveyance
Advisory Committee will be held on Monday,
January 6, 2025 at 4:00 pm. The meeting will
be held at the Minden Inn, at 1594 Esmeralda
Avenue, Room 306, Minden, NV 89423.
The Water Conveyance Advisory Committee
reserves the right to: take items in a different
order; combine two or more agenda items for
consideration; remove items from the agenda;
and/or delay discussions relating to an item
on the agenda at any time. The Agenda and
Staff Reports will be online prior to the meeting
https://www.douglascountynv.gov – click on
agendas and minutes.
For possible action. Discussion and possible
action to approve with conditions, continue until
corrected or deny the General Development
Application DP 24-0213 for Muller Parkway
Road improvements which may impact irrigation
facilities. The project seeks to construct two
lanes of Muller Parkway, approximately 3.2
Miles in length, and generally located between
Toler Lane and Heybourne Road. This
application considers the road work located
north of the project commonly referred to as
Ashland Park Subdivision (APN: 1320-34-002-
054) connecting to where Muller Parkway is
currently built in Minden. The work is generally
located within an existing road right of way but
also includes encroachments onto the parcels
more specifically described in the application.
The applicant is Douglas County and the project
is being represented by the County Engineer,
Jeremy Hutchings, PE.
For possible action. Discussion and possible
action to approve with conditions, continue until
corrected or deny the General Development
Application DP 24-0249 for Drayton Boulevard
Road improvements which may impact irrigation
facilities. The project seeks to construct
approximately 850 Feet of Drayton Boulevard
as a local road connecting Rubio Way to Acorn
Way and Sweetwater Drive. The project is
located in the Gardnerville Ranchos area just
north and west of the Bing Pit. The work is
proposed to be located within existing public
road right of way. The applicant is Douglas
County and the project is being represented by
Barbra Resnik, PE.
Questions and comments can be directed to the
County Engineer, Jeremy Hutchings, PE at 775-
782-9063, by email jhutchings@douglasnv.us or
fax comments to 775-782-9007.
Pub Date: December 18, 2024 Ad # 48541