March 17, 2021
The former volcano neck known as Cave Rock looms over Lake Tahoe.
Work on the third and most expensive part of the Cave Rock Water System is scheduled to begin this construction season at Lake Tahoe.
Lane shifts and reductions will take place Monday on Highway 50 through the Cave Rock tunnels at Tahoe as the Nevada Department of Transportation removes rock from the slope above the tunnels.
A state determination that $18 million in work on the Cave Rock Water System won’t pose any environmental concerns will make way for work to begin.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment